Developing Bridge Rating Factors for the Perrine Bridge Grant uri icon

Overview

abstract

  • The goal of this project is to create a finite-element computer model of the Perrine Bridge, calibrate that model with the results of load testing to be performed by the researchers, and provide the model and calibration to the Bridge Section for bridge rating.

date/time interval

  • January 1, 2004 - January 1, 2007

People